APS system that creates production schedules
at high speed for multiple items and multiple processes
The display of setup and teardown bars on the resource gantt chart can be changed so that the bars appear the same as the production bar.
The two properties: Setup time display method and Teardown time display method
have been added to the resource gantt chart. These are expression properties, allowing for greater control. For example, displaying setup bars on the main resource as normal, and setup bars on subresouces the same as the production bar, makes it easier to see which 'external setups' belong to which production.