Production Scheduling System Asprova Production Scheduling System Asprova
Home     Asprova     News     Solutions     Case Studies     Seminars     Distributors     Partners     FAQ     Download     Company     Site Map  





Chapter 1   Profit increase is a pleasure.

Examples of amazing results achieved by use of Asprova

The company executives who chose to deploy Asprova were skeptical at first too.
But these results are also a reality that could happen in your factory in the near future.

An electronic parts manufacturer in Tokyo

Before deploying Asprova we had the lowest score
in the benchmarking criteria of an important customer, but

now we're the runaway top. (Page 27, Line 9)

A paper factory in Tokushima

We were able to
entirely eliminate the more than 40 hours of overtime that the planning team was spending on the next month's production schedule.
(Page 54, Line 7)

A dye coloring manufacturer in Nara

After deploying Asprova, we experienced a
steep increase in sales. (Page 84, Line 9)

A car pipe manufacturer in Ibaraki

We were able to
reduce our inventory
by 30% in monetary terms. (Page 114, Line 3)

In the midst of price pressure, we were able to
lower our break-even point
by 35 percent.
(Page 114, Line 11)

Next

Home     Asprova     News     Solutions     Case Studies     Seminars     Distributors     Partners     FAQ     Download     Company     Site Map  
join the WINNERS
Lean Manufacturing Japan - Broadcasting the latest lean manufacturing know-how from Japan!
(c) Asprova Corporation 2008 - Production Scheduling System Asprova