APS system that creates production schedules
at high speed for multiple items and multiple processes
1. Quality control ... Operations which are not yet standardized sometimes cause defects
2. Cost and Profits ... Cost and profit per product should be visualized
3. Due dates ... The gaps between forecasted orders and fixed orders are hard to be adjusted. Emergency orders and order changes are causes of anxiety.
4. Globalization ... Close coordination with foreign factories is hard to maintain
Strict quality control, schedule management, and cost control are especially required in this industry.
Asprova's high speed production schedulers which enable "visualization" of schedules have served our clients' needs. The following is the introduction of Asprova's solution.
Engine parts, doors, chassis, interior (plastic molding), metal molds, shock absorbers, vehicle inspections, pipes, tubes, engines, cranes, rubber, aircraft parts, test bodies, brake parts, high-pressure hose, seat fabrics, wire rope, ansmissions,camshafts, crankshafts, cases, wire harnesses, motorcycles, bicycles, railway carriages, external parts for ships, anti-vibration equipment for vehicles, tires, movable anes...
Industry Solution Auto & Autoparts (PDF)
Industry Solution Data (Requires registration as a member)
・Piping and tubing - Kihara Manufacturing Company
・Auto parts (pedal assemblies, pulleys, pressed parts) - Shonan Unitec Corporation
・Suspension and rear axle beams - F-tech, Inc
・Auto parts - Auto Parts Manufacturer

Lean Manufacturing Japan - Broadcasting the latest lean manufacturing know-how from Japan!
All rights reserved by Asprova Corporation .