APS system that creates production schedules
at high speed for multiple items and multiple processes
Q:How to constrain the maximum amount that a furnace resource can process at once by the number of operations
A:
Steps:
1.In the calendar table, specify the maximum number of operations that can be processed at once by resource quantity in the "Shift codes" field.

Lean Manufacturing Japan - Broadcasting the latest lean manufacturing know-how from Japan!
All rights reserved by Asprova Corporation .