APS system that creates production schedules
at high speed for multiple items and multiple processes
Q:The name of the scheduling parameter is to long to be displayed all in the dropdown list box.How to make the dropdown list box longer.
A:
Yes.
Select [Tools] - [Customize] from the menu bar.The Customize dialog is displayed.Select the "setting" in the "Command" tab. the dropdown list box of the scheduling parameter is displayed. Return the dropdown list being displayed in the toolbar, appropriate the cursor to the pool of it, and the size of the cursor will be changed longer of shorter.

Lean Manufacturing Japan - Broadcasting the latest lean manufacturing know-how from Japan!
All rights reserved by Asprova Corporation .