APS system that creates production schedules
at high speed for multiple items and multiple processes
Perform long, mid, and short term scheduling across sales, manufacturing and purchasing in a single module.
Traditionally production scheduling systems were often used in combination with the MRP module of an enteprise system. However, such a combination produces the following problems:
(1) An interface must be developed between the scheduler and MRP system
(2) The MRP system and scheduler require different master data
(3) MRP purchase plans are not synchronized with the work instructions calculated by the scheduler.
(4) Returning schedule data to the MRP system to achieve such synchronization is problematic for most MRP systems.
Using Asprova APS alone fully solves these problems.
Schedule sales through purchasing all at once. Generate schedules fully pegging sales orders to manufacturing orders, and manufacturing orders to purchasing orders to enable true lead-time reduction and to reduce manufactured item and purchased item inventory.
Perform rough scheduling for the mid to long term and detailed scheduling for the short term, and display both on a single Gantt chart.

Lean Manufacturing Japan - Broadcasting the latest lean manufacturing know-how from Japan!
All rights reserved by Asprova Corporation .