APS system that creates production schedules
at high speed for multiple items and multiple processes
Create detailed schedules using FCS.

Create short term schedules at ultra-high speed. Asprova's production scheduler
provides numerous advanced features include external setup, time constraints
between processes (ESE, EES, ESSEE, SSEEE), pegging method between operations
(N-to-N, 1-to-1, inventory+1-to-1), inventory expiration date, pegging conditions.
Also, by synchronizing with mid/long term scheduling, short term schedules can be generated in consideration of long term schedules.
Define multiple products with a single manufacturing BOM through use of conditional expressions and calculation formulas. Even for problems that could traditionally only be solved through development of plug-ins or other customization, you can now solve just by entering expressions on the spot. This enables large reductions in the amount of manufacturing BOM data.
Enter skills of individual workers as a matrix and perform scheduling considering those skills. This greatly eases input and maintenance and manufacturing BOm data dependent on work skills, and can enable large reductions in the amount of data.

Lean Manufacturing Japan - Broadcasting the latest lean manufacturing know-how from Japan!
All rights reserved by Asprova Corporation .