Ver6.2.1 Use instruction bar and task bar can be resized on Gantt chart
On resource rows of a Gantt chart, the use-time of a use instruction or task bar (setup, production or teardown) can be changed with the mouse. When bar is selected by clicking with the left mouse button, an orange point will be appear on each end of the bar. Dragging this point with the mouse, the length of the bar can be changed. This feature can be used to – remove a […]
Ver6.1.1 “Graphical Master View”, an easy to use master data editor
“Graphical Master View”, an easy to use master data editor
